Real-world deployment of Njordair systems
See how Njordair rapidly deployable shelters create weather-protected, temperature-controlled and contained work environments worldwide.
Weather Protection for Rooftop Pool Construction | USA
Six CA-14 modules carried onto a roof with no crane access and inflated to enclose a 46 × 96 ft rooftop pool build.
Read case study
Temperature Control for Tank Thawing Operations | USA
Three CA-10 modules enclosed a frozen 21,000-gallon frac tank on its trailer so it could be heated, thawed and removed.
Read case study
Temperature Control for Swimming Pool Construction | USA
A heated three-module enclosure lets a Long Island pool contractor keep building through winter instead of stopping.
Read case study
Weather Protection for Wind Turbine Maintenance | USA
Two linked CA-12 modules moved by hand from turbine to turbine, giving repair crews cover without lifting equipment.
Read case study
Offshore Power Cable Jointing Enclosure | USA
A three-module SA-4 enclosure kept high-voltage cable jointing dry and clean on the South Fork Wind project.
Read case study
Temperature Control for Roof Coating Works | USA
Six CA-14 modules gave a dry, heated area for winter roof coatings, then were deflated and moved along the roof.
Read case study
Weather Protection for Material Storage | USA
A custom Constant Air shelter kept materials and work areas clear of heavy snow on a mountain construction site.
Read case study
Temperature Control for Swimming Pool Refurbishment | USA
A two-part custom shelter lets a pool renovation contractor keep refurbishing pools through Kansas City winters.
Read case study
Weather Protection for Winter Construction Works | USA
A compact single-module shelter protected exterior deck refurbishment at a ski resort in Breckenridge, Colorado.
Read case study
Weather Protection for Hospital Roof Replacement | UK
Inflatable modules installed at roof level kept a live hospital's RAAC roof replacement dry over a 40-week programme.
Read case study
Weather Protection for Cruise Ship Pool Refurbishment | France
Four CA-6 modules slid over the deck pools of MV Britannia so refurbishment could finish inside a tight port window.
Read case study
Turbine Maintenance Clean Room Enclosure | Oman
Four branded SA-6 modules and a matched air conditioning unit formed a temporary clean room for turbine maintenance.
Read case study
Temperature Control for Pipeline Welding Operations | UK
SA-6 shelters replaced fragile pop-up frames to keep butt fusion pipe welding at a steady temperature on remote sites.
Read case study
Rooftop Waterproofing Enclosure for Car Park Construction | UK
Three CA-8 modules gave a dry, controlled space for applying waterproof coatings to a rooftop car park deck.
Read case study
Dust Containment Enclosure for Pharmaceutical Facility | UK
A single SA-2 module contained dust from internal works inside a live pharmaceutical facility, with extraction to outside.
Read case study
Drilling Rig Weather Protection | High Altitude Mining, Chile
CA-12 modules enclosed a drilling rig at a high-altitude exploration site, shielding crew and equipment from wind and dust.
Read case study
Temperature Control for Winter Pool Construction | USA
Connected, heated modules let a pool contractor keep shotcrete, plastering and tiling on schedule through winter.
Read case study